Scheme Features: It collects traffic flow data within bus-only lanes and provides it to the signal control system of the entire route. While balancing the traffic demand of social vehicles, the system implements a signal control strategy that prioritizes buses at intersections.

It spans a total length of 17.5 kilometers, running east-west across the main urban area of Shanghai.
There are 25 stations in total, with an expected end-to-end travel time of 65 minutes.
The entire route passes through 5 main urban districts and 47 road intersections.
Layout Features of Geomagnetic Detectors
Over 600 geomagnetic detectors have been deployed at 47 intersections along the entire route.
Lanes for Deployment:
· Straight and left-turn lanes on branch roads
· Inbound and outbound bus lanes in both directions on main roads
Deployment Locations:
· 1 set of detectors is deployed 5 meters away from the stop line at the entrance and exit of bus lanes.
· 1 set of detectors is deployed 40 meters away from the stop line on branch roads.
· Each set consists of 2 detectors, with an interval of 4 meters between them.
Data Upload Granularity: 5 seconds